Led development of the Photon fluid system for the CAPSTONE lunar mission, qualifying it within two years.
Contributed to CAPSTONE's successful launch on 28 June 2022; the spacecraft is now in lunar orbit.
Led design of the RCS system for NASA's ESCAPADE mission (launched 2025) to study the Martian magnetosphere.
Vehicle Test Engineer II
February 2019 – March 2021 · 2 yrs 2 mos · Auckland, New Zealand
Led Electron integration and checkouts at Rocket Lab's Launch Complex 1 in Mahia — payload integration, high-level vehicle checkouts, and vehicle readiness.
From early 2020, led development of the Photon fluids and RCS systems for the CAPSTONE lunar mission, developing and qualifying an RCS system and its components in-house for testing on the Pathstone mission in March 2021.
Worked closely with a design engineer and technician to take the system from concept to flight-ready in 12 months, alongside the rest of the CAPSTONE fluids system — fluidic components and propellant-management systems.
Test Engineer
November 2016 – February 2019 · 2 yrs 4 mos
Conducted comprehensive testing of Electron hardware — structures, mechanisms, and fluid systems.
Designed and built custom test hardware in a fast-paced environment to meet project needs.
Executed random-vibration and environmental-loads testing to verify component reliability.
Contributed to payload-deployment and fairing-jettison testing.
Junior Vehicle Test Engineer
August 2016 – November 2016 · 4 mos
Random-vibration testing, modal analysis, and quasi-static testing.